BEDROCK DEPTH DETERMINATION BY
GEOPHYSICAL METHODS AT BLACK MOUNTAIN,
KENNON PROJECT, CAMP 6, TUBA, BENGUET
JUANITO C. FERNANDEZ,
PEDRO ESTUPIGAN AND RICARDO SANTOS
INTRODUCTION
The Black Mountain on Kennon Project
whose property is located at Camp 6, 12
kilometers south of Baguio City along
the Kennon Road proposes to drive their
main haulage level across the Bued
River. To obtain information from the
back of the proposed tunnel, a
geophysical survey was conducted over
the area to determine the thickness of
the overburden above the proposed
tunnel. With the thickness of the
overburden known, the back of the tunnel
can then be easily computed.